cá cược_các trò chơi cờ bạc_Cá độ bóng đá hợp pháp https://www.google.com//04c/news-media/whats-new en CROSS PASSAGE 10 CONSTRUCTION WORKS https://www.google.com//04c/news-media/whats-new/cross-passage-10-construction-works <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Mon, 2019-01-28</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> Starting as soon as February 4th, an assessment of the existing dewatering system will take place at the Cross Passage site between Lillian Street and Redpath Avenue. </div> </div> </div> <p>Starting as soon as February 4<sup>th</sup>, an assessment of the existing dewatering system will take place at the Cross Passage site between Lillian Street and Redpath Avenue. Assessment works will take approximately five (5) days. Following the assessment the dewatering system will be recommissioned and will operate on a 24 hour basis. Periodic maintenance will be required.</p> <p><img src="/sites/default/files/cp10_-_january_0.jpg" width="585" height="390" /></p> <p>&nbsp;</p> <p><strong>TRAFFIC, TTC AND PEDESTRIAN IMPACTS</strong></p> <p><a href="/04c/news-media/whats-new/cross-passage-10-construction-works" target="_blank">read more</a></p> Construction Updates Mount Pleasant Road Yonge Street Mon, 28 Jan 2019 17:23:32 +0000 NatalieA 2602 at/04c UPDATE: Overnight Concrete Pour at Fairbank Station - February 1, 2019 https://www.google.com//04c/news-media/whats-new/update-overnight-concrete-pour-at-fairbank-station-february-1-2019 <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Mon, 2019-01-28</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> On Friday, February 1, crews will perform a large concrete pour at the Main Entrance area of Fairbank Station. The concrete will form the concourse level of the Main Entrance. </div> </div> </div> <p><strong>What Work is Taking Place?</strong></p> <p>On Friday, February 1, crews will perform a large concrete pour at the Main Entrance area of Fairbank Station. The concrete will form the concourse level of the Main Entrance.&nbsp; Concrete pumps will be placed in the work zone and one on Vaughan Road, and concrete trucks will queue in the southbound lane of Dufferin Street between Eglinton Avenue West and Hunter Street.&nbsp; Dufferin Street and Eglinton Avenue West will remain open while work takes place, though traffic delays can be expected.</p> <p><a href="/04c/news-media/whats-new/update-overnight-concrete-pour-at-fairbank-station-february-1-2019" target="_blank">read more</a></p> Construction Updates Dufferin Street Mon, 28 Jan 2019 18:29:09 +0000 nicole 2603 at/04c Overnight Storm Sewer Connection Work at Brownlow Ave January 2019 https://www.google.com//04c/news-media/whats-new/overnight-storm-sewer-connection-work-at-brownlow-ave-january-2019 <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Fri, 2019-01-25</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> On January 30, crews will return to Brownlow Ave and Eglinton Ave to connect to the new storm sewer system installed last year. </div> </div> </div> <p class="ParagraphSub-Heading"><strong>What Work is Taking Place?</strong></p> <p>On January 30, crews will return to Brownlow Ave and Eglinton Ave to connect to the new storm sewer system installed last year.&nbsp; Concrete will be removed so that crews can access the manhole below ground.&nbsp; From there, concrete chipping and reforming will take place allowing the crews to connect to the new storm sewer infrastructure.&nbsp; This work will be performed 24 hours per day.</p> <p class="ParagraphSub-Heading"><strong> Hours of Work</strong></p> <p><a href="/04c/news-media/whats-new/overnight-storm-sewer-connection-work-at-brownlow-ave-january-2019" target="_blank">read more</a></p> Construction Updates Mount Pleasant Road Fri, 25 Jan 2019 21:34:02 +0000 NatalieA 2601 at/04c UPDATE: Concrete Pours at Keelesdale Station January 25 & 28, 2019 https://www.google.com//04c/news-media/whats-new/update-concrete-pours-at-keelesdale-station-january-25-28-2019 <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Thu, 2019-01-24</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> Due to the inclement weather conditions, the concrete pour scheduled for Friday January 25 will also need to take place on Monday January 28, 2019. </div> </div> </div> <p> </p><p style="margin: 0in; margin-bottom: .0001pt; background: white;">&nbsp;</p> <p><a href="/04c/news-media/whats-new/update-concrete-pours-at-keelesdale-station-january-25-28-2019" target="_blank">read more</a></p> Construction Updates Keele Street Thu, 24 Jan 2019 21:08:08 +0000 Lancefield 2599 at/04c Watermain Work ĘC Avenue Station https://www.google.com//04c/news-media/whats-new/watermain-work-avenue-station <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Thu, 2019-01-24</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> The installation of two additional valves is required on the local watermain near Eglinton Avenue West and Oriole Parkway and Eglinton Avenue West and Eastbourne Ave. The work will begin as soon as Tuesday January 29 and take approximately two (2) weeks to complete. </div> </div> </div> <p>&nbsp;</p> <p class="MsoNormal"><span style="font-family: &quot;times new roman&quot;, times; font-size: medium;"><strong style="mso-bidi-font-weight: normal;"><span style="color: #54a41c;">WHAT WORK IS TAKING PLACE?</span></strong></span></p> <p><a href="/04c/news-media/whats-new/watermain-work-avenue-station" target="_blank">read more</a></p> Avenue Road Construction Updates Thu, 24 Jan 2019 16:24:00 +0000 Lancefield 2597 at/04c MONITORING INSTRUMENT INSTALLATION OAKWOOD STATION https://www.google.com//04c/news-media/whats-new/monitoring-instrument-installation-oakwood-station <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Thu, 2019-01-24</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> Crews are required to replace two monitoring instruments in the Oakwood Avenue and Eglinton Avenue West intersection. </div> </div> </div> <p>&nbsp;</p> <p><strong style="font-family: &quot;times new roman&quot;, times; font-size: medium; background-color: #ffffff;"><span style="color: #54a41c;">WHAT WORK IS TAKING PLACE</span></strong></p> <p style="margin: 0in; margin-bottom: .0001pt; background: white;"><span style="font-size: medium; font-family: &quot;times new roman&quot;, times;">Crews are required to replace two monitoring instruments in the Oakwood Avenue and Eglinton Avenue West intersection.</span></p> <p style="margin: 0in; margin-bottom: .0001pt; background: white;">&nbsp;</p> <p><a href="/04c/news-media/whats-new/monitoring-instrument-installation-oakwood-station" target="_blank">read more</a></p> Construction Updates Oakwood Avenue Thu, 24 Jan 2019 18:29:15 +0000 Lancefield 2598 at/04c Reopening of North End of Existing East Platform at Kennedy GO Station https://www.google.com//04c/news-media/whats-new/reopening-of-north-end-of-existing-east-platform-at-kennedy-go-station <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Tue, 2019-01-22</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> Crews have successfully completed the restoration of the north end of the existing East Platform. It will be reopened beginning as early as Saturday, February 2, 2019. </div> </div> </div> <h3 class="ParagraphSub-Heading">What Work is Taking Place?</h3> <p class="paragraphsub-heading0">Kennedy Station is an interchange station with connections to the GO Transit Stouffville Line, the TTC Scarborough RT, the TTC Bloor-Danforth subway, and a TTC bus terminal. Construction of the Eglinton Crosstown LRT Kennedy Station will include upgrades to the existing Kennedy Station infrastructure.</p> <p><a href="/04c/news-media/whats-new/reopening-of-north-end-of-existing-east-platform-at-kennedy-go-station" target="_blank">read more</a></p> Construction Updates Kennedy Road Tue, 22 Jan 2019 16:43:07 +0000 PhilR 2592 at/04c Overnight Closure of Temporary Access Road for Utility Work https://www.google.com//04c/news-media/whats-new/overnight-closure-of-temporary-access-road-for-utility-work <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Tue, 2019-01-22</span> </div> </div> </div> <div class="field field-type-text field-field-news-summary"> <div class="field-items"> <div class="field-item odd"> There will be overnight closures of the temporary access road to Kennedy Station for three (3) nights beginning Tuesday, January 22, to undertake work on hydro lines. </div> </div> </div> <p>Last Updated: January 25, 2019</p> <h3><strong>WHAT WORK IS TAKING PLACE?</strong></h3> <p>To facilitate the ongoing utility relocation at the future Kennedy Station, there will be overnight closures of the Temporary Access Road.</p> <p>Work began on <strong>Tuesday, January 22, 2019</strong> and was scheduled for approximately three (3) nights<strong>. </strong>Due to extreme cold temperatures the work was incomplete. Crews will resume sleeving out wires on the hydro lines at the temporary access road on Tuesday, January 29, 2019.</p> <p><a href="/04c/news-media/whats-new/overnight-closure-of-temporary-access-road-for-utility-work" target="_blank">read more</a></p> Construction Updates Kennedy Road Wed, 23 Jan 2019 20:05:08 +0000 PhilR 2596 at/04c Updated: Resumption of Overnight Wet Utilities Work at Forest Hill Station January 24, 2019 https://www.google.com//04c/news-media/whats-new/updated-resumption-of-overnight-wet-utilities-work-at-forest-hill-station <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Tue, 2019-01-22</span> </div> </div> </div> <p><strong>What Work is Taking Place?</strong></p> <p>Crews have been completing overnight wet utility and hydro utility installation work at Forest Hill Station since September 2018; this work will continue through until mid-February 2019. 95% of all utilities relocation and installation work at Forest Hill Station have been completed.</p> <p>Resuming January 24, 2019, overnight water main chamber construction will commence on Eglinton Avenue, east of Bathurst Street. Traffic in the vicinity of the work area will be reduced to one (1) lane only, alternating in each direction.&nbsp;</p> <p><a href="/04c/news-media/whats-new/updated-resumption-of-overnight-wet-utilities-work-at-forest-hill-station" target="_blank">read more</a></p> Bathurst Street Construction Updates Tue, 22 Jan 2019 19:32:35 +0000 Jocelyn 2593 at/04c Traffic Deck Replacement at Eglinton West Subway Station (Cedarvale) https://www.google.com//04c/news-media/whats-new/traffic-deck-replacement-at-eglinton-west-subway-station-cedarvale <div class="field field-type-date field-field-news-date"> <div class="field-items"> <div class="field-item odd"> <span class="date-display-single">Tue, 2019-01-22</span> </div> </div> </div> <p><strong>What Work is Taking Place?</strong></p> <ul> <li>Crews will be replacing the road decking on the <span style="text-decoration: underline;">north</span> side of Eglinton Avenue from Park Hill Road to Allen Road South.</li> </ul> <p class="ParagraphSub-Heading"><strong>Hours of Work</strong></p> <p><a href="/04c/news-media/whats-new/traffic-deck-replacement-at-eglinton-west-subway-station-cedarvale" target="_blank">read more</a></p> Allen Road Construction Updates Tue, 22 Jan 2019 20:16:02 +0000 Jocelyn 2595 at/04c